EDM discharge automation
● 24-hour unattended processing ● Automatic loading/unloading of electrode and steel workpiece ● The efficiency of equipment has been greatly improved ● Remote and efficient maintenance Control system: X-MASTER intelligent manufacturing system Equipment: 6 EDMs (Makino) and 1 Robot Fixture: EROWA or 3R Other Components: Rails, electrode racks and steel workpiece racks , etc |
Operation Procedure: ※ Operation Procedure:Operation Procedure; ※ Pair the NC program with the raw workpiece by read/write the RFID tag; ※ Loading the processed and inspected electrode into electrode racks. Project Highlights: ※ Automatic workpiece loading/unloading ,realize EDM 24h unattended discharging, reduces labor costs and greatly improves production efficiency; ※ One pallet with multiple pieces : Up to 12 steel parts can be placed on one pallet; ※ Realize the EDM C-axis function: When the EDM is not equipped with the C-axis, the reference angle converted by robot rotate motion; ※ Operator load/unload the electrode on the material rack to avoid the influence of human factors on processing. |